Introduction to Train Bulk Loader
Description of train bulk loader:
·The supply of train bulkers does not include rails, and users are required to provide and fix their own rails;
·The height difference of steel rails for train bulk loaders should be ≤1mm within the same plane, and the height difference at track joints should be less than 1mm;
·Rail center 1350±1.5;
A JY28-00-13 travel switch support plate is welded at a position 5620mm from the end of the steel rail to serve as a motion limit stop.
Technical parameters of train bulk loader:
·The loading and unloading capacity of the train bulk loader is capped at 300t/h;
·The upper limit of the descent stroke of the bulk head of the train's bulk loader is 2500, and the upper limit of its moving distance is 6000;
·The power of the winch motor is 2.2KW, with a voltage of 380V;
· The power of the walking motor is 1.5KW, and the voltage is 380V;
·Bulk head vibrating electrical appliance, power 0.06KW, 220V;
·The power of the ventilation fan for the train bulk loader is 2.2KW, with a voltage of 380V;
·The dust collection equipment is to be provided by the user, with a dust collection air volume of approximately 4200m3/h;
·The ordering of the electric control box is subject to separate negotiation, and it can be designed separately according to the specific control requirements and system conditions.

1. Winch device 2. Observation window 3. Rope-releasing switch device 4. Wheel device
5. Ventilator 6. Double chute 7. Traveling reducer 8. Bulk head
9. Train bulk loader feeding device 10. Steel rail 24Kg/m (fixing method to be determined)
Technical parameters of train bulk loader
The information is being supplemented. Please stay tuned
Purpose of railway bulk loader
The information is being supplemented, please stay tuned